| We've worked pretty hard this month, I'm so glad we get a three-week break! Tomorrow we go to Alaska on our cruise with Peter and Meredith. But here's what we got done: The master bathroom is about 90% done, it only needs the tile around the door to the shower. |
|
 |
The plumber installed one of our cool bathroom sinks, but not the other. We didn't find the drain in time. |
| The limestone is in the middle, the pebbles around the outside The toilet is in and it works. Only the water is off because there's a leak downstairs. |
 |
 |
Our bedroom has a floor, but no trim. The closet has a floor too, we put that in after the plumber's leak happened where we stored the flooring. We dried it out and then installed it, quickly. |
| The intense blue skies of San Juan Island are in our cupola. |
 |
 |
Here's the window sill of the Meredith bathroom upstairs. Meredith figured out how to lay the tiles and pebbles up there. |
| The pedestal sinks go there. We discovered that they aren't the same size and they have different hole configurations for the faucets. Aargh. |
 |
 |
We like the pebbles going under the tub. That teak tub will be beautiful in here. |
| The handscrubbed teak floor went in so efficiently that we had enough to put into the downstairs guest bedroom. And we still have one box left. |
 |
 |
We set up one of the outdoor tables in the dining area and put the Penny Lane candle chandelier up over it. |
| Here's the kitchen. Our under the counter sink is now an over. Too hard to do with the wrong tools. |
 |
 |
Jim and Jonee flew home the day they arrested all those people in England for planning to take planes out with liquid explosives. They waited two hours to get through security in a line that went outside the airport. We got in the ferry line to go see Paisley and Peter and the kids. After we got our Pelindaba coffee, we realized we'd locked the truck with the keys inside. Hawk solves the problem. |